Assam: ONGC clears rig base at RDS site, begins final phase of well control amid flood challenges

ONGC achieved a crucial step at the RDS site by removing tubing stands from the rig derrick, paving the way for rig base removal and capping stack installation. A temporary increase in non-toxic gas discharge is expected during the BOP dismantling, posing no risk beyond 500 meters.

Leave a Reply

Your email address will not be published. Required fields are marked *